Sustainable Management of Resources from Building Demolition: Strategies for Rescue, Recycling, and Material Value Recovery
Sustainable Management of Resources from Building Demolition: Strategies for Rescue, Recycling, and Material Value Recovery
Maryam Borumand1 Mohammadhossein Golriz2
1) Ph.D. in Urban Planning Tehran Municipality, Iran,
2) M.Sc. in Civil Engineering, Tehran Municipality, Iran,
IOI Code
:
ABKD-ACAHKZ
Publication :
Fourth International Conference on applied researches in civil engineering, architecture and urban planning (icarcau.com)
Abstract :
The construction and demolition (C&D) sector generates substantial quantities of waste and consumes significant amounts of natural resources. Recovering materials from demolished buildings can reduce waste disposal, conserve primary resources, and support the transition towards a circular economy. However, achieving these benefits requires moving beyond conventional demolition practices towards systematic assessment, selective dismantling, reuse, and recycling. This paper reviews key strategies for managing resources recovered from building demolition, focusing on material recovery pathways, technical considerations, environmental and economic assessment, and implementation barriers. It distinguishes direct component reuse from material recycling and discusses the recovery potential of common demolition-derived materials, including concrete, masonry, metals, timber, glass, and gypsum. The paper highlights the importance of pre-demolition audits, material identification, contamination control, quality assessment, and appropriate processing in determining whether recovered materials can be safely and effectively reused or recycled. Life-cycle assessment and economic evaluation are considered essential tools for comparing recovery options with conventional disposal and for identifying potential environmental benefits and trade-offs. Despite these opportunities, resource recovery remains constrained by inconsistent material quality, limited information about existing buildings, logistical challenges, regulatory requirements, market uncertainty, and the costs of selective dismantling. In response, the paper proposes a practical framework that integrates pre-demolition assessment, recovery planning, selective dismantling, material sorting and testing, selection of suitable reuse or recycling routes, and performance monitoring. The framework emphasizes prioritizing direct reuse where technically feasible, followed by high-quality recycling when reuse is impractical. Overall, the paper argues that effective demolition resource management depends on integrating technical assessment, environmental evaluation, economic feasibility, and coordinated planning to improve material value retention and reduce the environmental burden of construction and demolition waste.
Keywords : construction and demolition waste building demolition material recovery component reuse recycling circular economy life cycle assessment