A Framework for Forecasting Unforeseen Costs in Construction Projects Using Artificial Neural Networks: An Approach Based on Historical Data and Predictive Analytics

A Framework for Forecasting Unforeseen Costs in Construction Projects Using Artificial Neural Networks: An Approach Based on Historical Data and Predictive Analytics

Aidin Riyazi1 Misam Valimohammadi2 Nategh Afzal3 Siamak Haji yakhchali4

1) PhD Student in Civil Engineering, Construction Management, University of Tehran, Tehran, Iran
2) PhD Student in Civil Engineering, Construction Management, University of Tehran, Tehran, Iran
3) PhD Student in Civil Engineering, Construction Management, University of Tehran, Tehran, Iran
4) Professor, Faculty of Industrial Engineering, University of Tehran, Tehran, Iran

IOI Code : AACC-AAFFKK
Publication : Third International Conference on applied researches in civil engineering, architecture and urban planning (icarcau.com/3rd)
Abstract :
    Cost management is considered one of the most important pillars of success in construction projects, because deviation from the initial estimate can have widespread consequences such as reduced profitability, delayed project completion, reduced output quality, and even complete project failure. Unforeseen costs, as one of the main factors causing this deviation, have always been a serious challenge for project managers and planning engineers. Identifying and accurately estimating these costs before they occur can significantly reduce financial and operational risks. In this study, a framework for forecasting unforeseeable costs in construction projects based on Artificial Neural Networks (ANN) is presented. The proposed model is trained using historical project data including information on direct and indirect costs, activity execution duration, design changes, performance indicators, and environmental factors. In the model development process, the data is first preprocessed and the quality and efficiency of the inputs are improved using normalization and feature selection techniques. Then, the network architecture is designed to include an input layer (proportional to the number of variables), one or two hidden layers with nonlinear activation functions (such as Sigmoid and ReLU), and an output layer with a linear activation function. The model is trained using the error backpropagation algorithm and the Adam optimizer, and its performance is evaluated based on RMSE, MAE, and coefficient of determination (R²). The experimental results show that the proposed ANN model has been able to estimate the amount of unforeseen costs with high accuracy and provides better performance than traditional statistical models and some linear machine learning methods. This approach can be used as a decision support tool in the cost management process and, by identifying financial deviations early, helps to improve planning, resource allocation, and reduce economic risks in construction projects.

Keywords : cost management unforeseen costs construction projects artificial neural networks cost forecasting project management