Optimization of Lime and Blast Furnace Slag Percentages in Clay-Sand Soil Stabilization with Emphasis on Curing Time
Optimization of Lime and Blast Furnace Slag Percentages in Clay-Sand Soil Stabilization with Emphasis on Curing Time
Abbas Asadi Ouderji1 Mojtaba Ghasemi2
1) Department of Civil Engineering, Kerman Non-Profit Higher Education Institute, Kerman,
2) Department of Civil Engineering, Kerman Non-Profit Higher Education Institute, Kerman
IOI Code
:
AACH-ABFKGA
Publication :
7th.International Conference & 8th.National Conference on Civil Engineering, Architecture, Art and Urban Design(8iccacs.ir)
Abstract :
The use of industrial waste materials such as blast furnace slag alongside lime is an economical and environmentally friendly method for improving problematic soils. In this study, the effects of varying percentages of lime (0, 2, 4, and 6%) and slag (0, 5, 10, 15, and 20%) on the unconfined compressive strength of a sand-clay mixture were investigated at curing ages of 14, 28, and 56 days. The results showed that at 14 and 28 days of curing, the specimen containing 6% lime and 15% slag exhibited the highest strength; however, at 56 days, the specimen with 2% lime and 20% slag achieved the maximum strength. Furthermore, specimens without lime (only slag) showed no strength increase. These findings indicate that with increased curing time, lime consumption can be reduced and slag percentage can be increased without compromising the final strength; this leads to significant economic savings in large-scale projects.
Keywords : soil improvement blast furnace slag lime unconfined compressive strength curing time