Evaluating the Relationship between the Organizational Structure of Construction Companies and Delays in Construction Projects
Evaluating the Relationship between the Organizational Structure of Construction Companies and Delays in Construction Projects
OMID HELALI GHESHLAGHI1
1) Graduated with a Master s degree in Civil Engineering, Construction Management Engineering, Islamic Azad University, Bonab Branch.
IOI Code
:
AACZ-ABGEDD
Publication :
The 5th International Conference on Seismic Retrofitting(5icst.ir)
Abstract :
The purpose of this study was to investigate the relationship between organizational structure of construction companies with delayed development projects in construction companies in East Azerbaijan province. The present study was carried out in a descriptive-analytical manner, which is a practical purpose and conducted with a survey method in the statistical society of the construction companies of the East Azarbaijan province. In a statistical society of 551 companies, standard questionnaires were distributed randomly among 226 companies (at 95% confidence level and 5% error margin). For data analysis, Structural Equation Modeling (SPSS) and Lisrel software were used. After assessing the reliability and validity of the structure, the results of the research indicate that the organizational structure in general causes a 15% reduction in delays, also, research indicates that the dimensions of organizational structure (formalism, complexity, and concentration) alone do not reduce delays, and organizational structure reduces delays entirely. The meaning of abovementioned founding is that merely the formalization, focus, or complexity of the organization does not reduce delays, but proper interaction, decentralization and complexity reduce delays in the project.
Keywords : organizational structure project delays construction companies