Analysis of the Mechanism and Risk Management of Squeezing Ground in Mechanized Tunneling with TBM: Preventive Strategies and TBM Stuck Release Procedures
Analysis of the Mechanism and Risk Management of Squeezing Ground in Mechanized Tunneling with TBM: Preventive Strategies and TBM Stuck Release Procedures
Alireza Mohammadzadeh Havestin1
1) Mining Engineering Expert
IOI Code
:
AAGF-ABZZZF
Publication :
9th International Conference on Applied Researches in Science & Engineering (carseconf.com/9th)
Abstract :
Mechanized tunneling using a TBM has been employed since the late 19th century for excavating large tunnels, and it has always faced new and unique challenges, including regulation of face pressure, groundwater tables, tunnel wall maintenance, and more. The sectional squeezing of the ground as a result of the displacement of rocks surrounding the TBM double shield hard rock cutterhead during advancement within the plastic zone and the massive andesitic faulted ground at kilometer 1652 of a water transfer tunnel with a 6225 mm excavation diameter has been studied in terms of risk management, preventive strategies, and mitigation measures.
Keywords : mechanized drilling tbm squeezing ground fault zone risk management