Reducing the cost of reliability of distribution networks, with optimal use of batteries and the presence of wind generators
Reducing the cost of reliability of distribution networks, with optimal use of batteries and the presence of wind generators
Ahad Salimi1 Mahmood Reza Zahedi2 Seyed Iman Seyedi3
1) Assistant Professor, Department of Electrical Engineering, Islamic Azad University, Zarrin Dasht
2) Master Student, Department of Electrical Engineering, Islamic Azad University, Zarrin Dasht
3) Assistant Professor, Department of Electrical Engineering, Islamic Azad University, Zarrin Dasht
IOI Code
:
AAHD-ABEBZF
Publication :
National Conference on Information Technology, Nanotechnology, Artificial Intelligence and Technological Futures Studies(itnaf.ir)
Abstract :
In recent years, energy storage systems have emerged as critical components of power grids, experiencing remarkable technical and economic growth. These technologies offer diverse capabilities to power networks. However, despite their extensive benefits, energy storage units such as batteries are still considered emerging and costly technologies. Thus, even with technological advancements, optimal planning of these systems can serve as a cost-effective solution to reduce expenses. On the other hand, wind power generation has gained significant popularity due to its environmental advantages and widespread availability. Nevertheless, the uncertainty associated with the output of these resources poses a fundamental challenge to power systems. To address this challenge, utilizing energy storage systems represents a potential solution. This thesis focuses on the problem of energy storage deployment planning with objectives including reducing reliability, operational, and investment costs, as well as improving peak load management and voltage control. In this regard, a multi-objective model is presented for long-term planning and short-term operations. To handle the uncertainty stemming from wind power generation, the proposed planning model is formulated using the Point Estimate Method (PEM). Reactive power injection by batteries is an aspect that has received limited attention in previous research. Additionally, considering the possibility of network islanding is a factor that increases reliability costs; hence, this issue has also been incorporated into the proposed framework. The proposed method is solved as a two-stage problem: First, the optimal location, capacity, and power rating of batteries are determined with the goal of minimizing reliability, operational, and investment costs. In the second stage, optimal charging and discharging scheduling of batteries is performed to enhance peak shaving and grid voltage regulation. The probabilistic problem presented in both stages is solved using the Particle Swarm Optimization (PSO) algorithm. The results obtained from implementation on a 27-bus test system, considering various scenarios based on different levels of wind power penetration, confirm the effectiveness of the proposed method in seasonal and long-term studies.