Analysis and Prioritization of Construction Execution Errors Affecting the Quality and Durability of Reinforced Concrete Buildings in Ahvaz Using the TOPSIS Method

Analysis and Prioritization of Construction Execution Errors Affecting the Quality and Durability of Reinforced Concrete Buildings in Ahvaz Using the TOPSIS Method

Mojtaba Hallajian1

1) M.Sc in Civil Engineering (Project and Construction Management) -

IOI Code : AAHE-ABGAAD
Publication : National Conference on Civil Engineering, Design and Construction Technologies, Energy, Materials and Advanced Machinery(icaeu.ir)
Abstract :
    Reinforced concrete buildings constitute a major portion of urban construction projects in Iran, particularly in the city of Ahvaz. The specific climatic conditions of Ahvaz, including extremely high temperatures, intense solar radiation, variable humidity, dust storms, and aggressive environmental agents, increase the importance of construction quality and structural durability. Experience from construction projects in this region indicates that a significant part of durability reduction, cracking, reinforcement corrosion, and increased maintenance costs is caused by construction execution errors during different stages of the building process. The aim of this study is to identify and prioritize the most critical construction execution errors affecting the quality and durability of reinforced concrete buildings, with particular emphasis on the environmental and construction conditions of Ahvaz. The major execution errors investigated in this research include deficiencies in supervision and quality control, reinforcement placement errors, formwork defects, concrete casting errors, improper curing, and premature formwork removal. These factors were evaluated using the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) based on five criteria: structural safety, durability, cost impact, probability of occurrence, and difficulty of correction. The results revealed that deficiencies in supervision and quality control ranked first with a closeness coefficient of 0.84, followed by reinforcement-related errors (0.81) and concrete casting errors (0.76). The findings indicate that implementing an effective quality management system, providing continuous training for construction personnel, ensuring proper concrete placement and curing under hot-weather conditions, and strengthening technical supervision can significantly enhance structural durability, reduce maintenance costs, and improve overall construction quality.

Keywords : reinforced concrete buildings ahvaz construction quality execution errors topsis quality control structural durability