Prioritization of BIM Adoption Strategies in Iran s Construction Industry: Lessons from Developing Countries
Prioritization of BIM Adoption Strategies in Iran s Construction Industry: Lessons from Developing Countries
Hamoun Dadashvand1
1) Master of Science in Civil Engineering, Construction Engineering and Management, Kharazmi University, Tehran,
IOI Code
:
AAHE-ABGAKK
Publication :
National Conference on Civil Engineering, Design and Construction Technologies, Energy, Materials and Advanced Machinery(icaeu.ir)
Abstract :
Building Information Modeling (BIM) is recognized as one of the most influential transformative technologies in the global construction industry. International studies have shown that BIM can reduce project execution time by up to 30%, costs by up to 25%, and rework by up to 50%. Despite these benefits, the adoption rate of BIM in Iran is remarkably low, and it is estimated that less than 10% of large engineering and contracting companies seriously utilize this technology. This research aims to go beyond merely listing barriers — an approach that has been repeated in over 20 previous domestic articles. Using a systematic literature review (27 selected sources out of 247 initial sources) and qualitative content analysis, the barriers are classified into three main categories: (1) human and cultural, (2) structural and economic, and (3) institutional and legal. The main innovations of this research are at three levels: (a) presenting a comparative table of BIM adoption in Iran against three developing countries (Turkey, Malaysia, India) that have undergone a similar path, (b) designing a two-dimensional prioritization matrix based on potential impact and ease of implementation criteria, and (c) providing a three-horizon time framework (short-term, medium-term, long-term) with designated responsible bodies. The results show that, contrary to popular belief, the most critical barriers are resistance to change and lack of skilled personnel , not merely high initial costs . The comparative analysis indicates that Iran is approximately 10 to 15 years behind countries like Turkey and Malaysia. Finally, three specific strategies with short-term (first year), medium-term (second to third year), and long-term (third to fifth year) time horizons, along with executive responsible bodies, are proposed.
Keywords : building information modeling (bim) adoption barriers comparative analysis iran s construction industry strategy prioritization