Comparison of Hollow Concrete Slab Systems
Comparison of Hollow Concrete Slab Systems
Zeinab Ghobadi1 Seyed Morteza Kazemi2
1) Department of Architecture Engineering, Kashmar Branch, Islamic Azad University, Kashmar, Iran
2) Department of Architecture Engineering, Kashmar Branch, Islamic Azad University, Kashmar, Iran
IOI Code
:
AAHE-ABHACK
Publication :
National Conference on Civil Engineering, Design and Construction Technologies, Energy, Materials and Advanced Machinery(icaeu.ir)
Abstract :
With the increasing demand for flexible architectural spaces, long-span structures, and reduced material consumption, the use of two-way hollow concrete slab systems such as U-Boot and Cobiax has gained significant attention. This study aims to provide practical criteria for selecting between these two systems by comparing their structural, constructional, and building physics performance. The research adopts a descriptive–analytical approach based on the review of technical documents and case studies of two prominent projects in Iran, namely the Arg-e Tajrish Commercial Complex (Cobiax) and Iran Mall (U-Boot). The results indicate that the geometry of the permanent void formers has a direct influence on structural performance. Due to the use of spherical void formers, the Cobiax system achieves a considerable reduction in slab self-weight and facilitates concrete placement; therefore, it is more suitable for projects subjected to conventional loading conditions. In contrast, the U-Boot system creates a grid of orthogonal concrete ribs, resulting in greater flexural stiffness and improved performance under heavy loads and in controlling deflection over large spans. Furthermore, both systems exhibit satisfactory thermal and acoustic insulation properties. Consequently, the selection of the appropriate system should be based on loading requirements, architectural considerations, and the construction capabilities of the project.
Keywords : hollow concrete slabs cobiax u boot iran mall arg e tajrish structural performance construction management