Stakeholder psychological profiles as moderators of marginal utility in project performance and success
Stakeholder psychological profiles as moderators of marginal utility in project performance and success
Ali Ghassemi Azizabadi1 Mortaza Haghifam2 Sana Chehraghani3 Mohammad Hossein Dadpour4
1) K. N. Toosi University of Technology Email:
2) K. N. Toosi University of Technology Email:
3) K. N. Toosi University of Technology Email:
4) Mehralborz University Email:
IOI Code
:
AAHE-ABHDKH
Publication :
National Conference on Civil Engineering, Design and Construction Technologies, Energy, Materials and Advanced Machinery(icaeu.ir)
Abstract :
This study aimed to investigate the psychological profile of project stakeholders and evaluate its various dimensions in the context of project management. In this study, first, psychological dimensions and criteria related to project stakeholders were extracted through a review of theoretical literature and previous research. Then, questionnaire items were developed based on these criteria. After designing the questionnaire, data were collected from a group of experts and analyzed using descriptive statistical methods, reliability and validity analysis, and measurement model evaluation indicators with a structural equation modeling approach based on partial least squares. In this study, psychological dimensions including motivation, expectation, attitude, behavior, concern, and stakeholder interaction were examined.The findings showed that project stakeholders have a relatively favorable level of expectation, motivation, and behavioral readiness to participate in project processes, which indicates their appropriate capacity to cooperate and follow up on project matters. In contrast, concerns and two-way interactions were less intense compared to other dimensions. The results of statistical analyses also showed that there was no significant difference between different age groups and dominant roles in the project in terms of psychological dimensions. Accordingly, the present study, while providing a picture of the psychological state of project stakeholders, emphasizes the importance of paying attention to these dimensions in managing project participation and interactions
Keywords : psychological profile project stakeholders experts reliability and validity analysis descriptive statistics