The impact of resource and time management on urban infrastructure and construction Based on conducted research

The impact of resource and time management on urban infrastructure and construction Based on conducted research

Masoud Mohammadi1 Mostafa Ghazi Moradi2

1) Islamic Azad University of Kashan Email:
2) Islamic Azad University, Tehran Email:

IOI Code : AAHE-ACZAAF
Publication : National Conference on Civil Engineering, Design and Construction Technologies, Energy, Materials and Advanced Machinery(icaeu.ir)
Abstract :
    This review article examines and analyzes research conducted in the field of resource management, scheduling, and urban infrastructure. This article reviewed and content-analyzed 16 articles from Ganj, 6 articles from Civilica (out of 87 Persian articles by searching the keywords resource management, scheduling (time), and urban infrastructure (construction) ), and 40 articles from ScienceDirect and Springer (out of 706 articles). Various studies have shown that optimal cost and quality management in construction and infrastructure projects plays a key role in increasing efficiency, reducing costs, and improving the quality of urban services. The use of new technologies such as Building Information Modeling (BIM) and data mining helps to improve accuracy in cost and time estimation, reduce risks, and optimize resource allocation. Furthermore, optimizing project scheduling with metaheuristic algorithms and robust optimization models increases productivity and reduces delays. Major challenges in infrastructure projects include a lack of financial and human resources, weaknesses in planning and supervision, and a lack of appropriate use of new technologies. Solutions such as training skilled workers, using earned value management systems, and developing smart urban infrastructure are proposed to address these problems. In addition, public participation in project financing and the creation of intelligent decision support systems are effective factors in improving the management of urban projects. Finally, this review shows that combined approaches to resource management, optimal scheduling, and the use of new infrastructure technologies can lead to sustainable development and improved quality of life in cities.

Keywords : resource management scheduling urban infrastructure construction planning