Economic-Legal Analysis of Public-Private Partnership (PPP) Contracts for Tabriz Municipality Infrastructure Projects
Economic-Legal Analysis of Public-Private Partnership (PPP) Contracts for Tabriz Municipality Infrastructure Projects
Hassan Afsari1
1) Bachelor of Law, Payam Noor University of Maragheh, Iran
IOI Code
:
AAHF-ABGHDA
Publication :
National Conference on Architecture and Art Technologies, Smart City, Soft and Creative Industries and Technological Culture(icact.ir)
Abstract :
Urban infrastructure projects, as drivers of economic development and entrepreneurship, are increasingly implemented through Public-Private Partnership (PPP) contracts. However, the unbalanced allocation of legal risks in these contracts undermines the economic viability of projects and leads to the failure of entrepreneurial investments. The aim of this research is to provide an economic-legal analysis of the risk allocation pattern in PPP contracts for infrastructure projects of Tabriz Municipality and to identify the inefficient contractual clauses that give rise to legal disputes and diminish economic returns. The study was conducted using a qualitative approach and a case study method. The population under investigation comprises PPP projects of Tabriz Municipality over the past decade, from which a flagship infrastructure project—facing significant legal and economic challenges—was selected through purposive sampling. Data were collected through content analysis of contractual documents, examination of relevant litigation case files, and semi-structured interviews with project managers, private sector investors, and legal consultants. The analytical framework was designed based on the economic principles of efficient risk allocation and the legal doctrine of contractual liability. The findings reveal that the imposition of exogenous risks beyond the private party s control—particularly risks associated with land acquisition delays, changes in legislation, and unilateral termination of contract by the public entity—constitutes the most significant legal factor reducing the internal rate of return of projects and increasing judicial disputes. This situation, besides imposing substantial opportunity costs, has also diminished the incentives for entrepreneurs and investors to participate in future projects. Conversely, projects that employed standard international risk allocation clauses and non-judicial dispute resolution mechanisms demonstrated more successful performance. The study concludes that redesigning the risk allocation model in Tabriz Municipality s PPP contracts, through an approach that simultaneously considers economic considerations (efficiency and investment incentives) and legal requirements (enforceability and contractual security), is an essential prerequisite for the sustainability of infrastructure projects and the development of urban entrepreneurship. Finally, reform recommendations are presented in the form of proposed contractual provisions.
Keywords : risk allocation economic legal analysis infrastructure projects tabriz municipality urban entrepreneurship