Optimal Site Selection for Solar Power Plant Using Geographic Information System (GIS) and the Rapid Impact Assessment Matrix (RIAM): A Case Study of the Shoreline of Lake Urmia

Optimal Site Selection for Solar Power Plant Using Geographic Information System (GIS) and the Rapid Impact Assessment Matrix (RIAM): A Case Study of the Shoreline of Lake Urmia

Mohammad Ebrahim Ramazani1 Najibeh Jafari Narinabad2 Maryam Asghari3

1) Associate Professor, Department of Environmental Science and Engineering, Islamic Azad University, Tabriz
2) Ph.D. Candidate in Environmental Science and Engineering, Islamic Azad University, Tabriz
3) Ph.D. Candidate in Environmental Science and Engineering, Islamic Azad University, Tabriz

IOI Code : ABFF-ABDGDZ
Publication : 9th International Congress of Developing Agriculture, Natural Resources, Environment and Tourism of Iran(9icsda.ir)
Abstract :
    Considering the water scarcity crisis of Lake Urmia and the electricity imbalance in northwestern Iran, this study was conducted to identify the optimal site for a 250 MW photovoltaic solar power plant (covering 375 hectares) in Bonab County. The research employed a combined methodology based on Geographic Information System (GIS) and the Rapid Impact Assessment Matrix (RIAM) (Pastakia & Jensen, 1998). Sensitive features (protected areas, settlements, rivers, and agricultural lands) were first filtered, and technical–economic criteria were applied to identify four potential sites. Subsequently, nine key criteria (area, accessibility, solar radiation, land ownership, river buffer, protected area buffer, residential distance, wind exposure, and land use) were scored and compared using RIAM. The results indicated that the first option (salt lands near the villages of Isa Khan and Khaneh Bargh) with a total score of +42 (mostly within +A and +B ranges across criteria) was the most suitable location. The main negative impacts (-A) were related to its 896-meter proximity to Lake Urmia National Park and wind exposure, which can be mitigated through management measures such as windbreaks, native vegetation cover, and bird monitoring. Positive impacts included the creation of 510 jobs, avoidance of 480,000 tons of CO₂-equivalent emissions annually, and reduction of 1.2 million cubic meters of water consumption. This project aligns with Iran’s climate commitments and the Seventh Development Plan, offering a successful model for clean energy development in environmentally sensitive areas.

Keywords :