The Impact of Weather Conditions on Contractor Claims

The Impact of Weather Conditions on Contractor Claims

Kiarash Zhale1 Mohsen Jafarizade2

1) Civil Engineering Student (specializing in Water Resources Engineering and Management), Islamic Azad University, Central Tehran Branch, Iran,
2) Civil Engineering Student (specializing in Water Resources Engineering and Management), Islamic Azad University, Central Tehran Branch, Iran,

IOI Code : ABFG-ACAAGB
Publication : 12th.international Congress on Civil Engineering, Architecture, Art and Urban Development(12icsau.ir)
Abstract :
    Managing disputes between the employer and the contractor in construction projects is of significant importance. This study addresses a specific factor that can lead to contractor claims and disputes between the parties: the impact of weather conditions on contractor claims. A descriptive-analytical research methodology, based on a review of existing literature, was employed. Relevant research was examined and analyzed, and the findings are presented herein. Adverse weather conditions can cause project delays, extending the execution timeline by 5% to 20%. Furthermore, such conditions may, in certain instances, compromise the quality of the project. Factoring in weather conditions during the contract-drafting phase of construction projects can lead to more accurate estimations of project duration. Several recommendations are proposed to better manage the impact of weather conditions on construction projects, including: 1) fostering greater collaboration between the employer and the contractor, and avoiding the imposition of all associated losses solely upon the contractor; 2) selecting personnel with experience working in similar climatic conditions; 3) prioritizing the recruitment of local staff; and 4) making efforts to forecast potential weather conditions for the project.

Keywords : weather conditions contractor s claims employer contractor