Assessing the Impacts of War on Gold and Silver Mining and Mineral Processing Plant Construction: Strategies for Enhancing Resilience
Assessing the Impacts of War on Gold and Silver Mining and Mineral Processing Plant Construction: Strategies for Enhancing Resilience
mohammad kakeshpour1 Ehsan Abde sharafat2
1) Planning and Project Controls Specialist, Pars Tamin Mining Development Company, Tehran, Iran
2) Head of Planning and Project Controls Department, Pars Tamin Mining Development Company, Tehran, Iran
IOI Code
:
ABFG-ACAKDF
Publication :
12th.international Congress on Civil Engineering, Architecture, Art and Urban Development(12icsau.ir)
Abstract :
War is one of the major factors affecting the activities of the mining industry. It can influence mining operations through reduced investment, financial and trade restrictions, economic sanctions, disruptions in access to equipment and spare parts, increases in the prices of consumables and energy, and reduced availability of specialized personnel. These impacts take on distinct dimensions in gold and silver mining due to the capital-intensive nature of mining activities, the import dependency of certain equipment, the critical importance of production continuity, and the sensitivity of projects to precious metal prices. Beyond mining operations, the construction and commissioning of mineral processing plants under wartime conditions may be affected by increased capital investment costs, longer equipment procurement lead times, restrictions on engineering services, difficulties in financial transfers, higher transportation and insurance costs, and the risk of interruptions or delays in installation and commissioning. This study aims to explain the mechanisms through which war and sanctions affect gold and silver mines and their associated processing plants. It also examines mining investment, economic sanctions, and precious metals markets in relation to mining performance. Accordingly, the physical progress of two mines and three contractors—comprising a mining contractor, an access road construction contractor, and a mineral processing plant construction contractor—was examined through descriptive case studies across three periods: before, during, and after the 40-day Iran–United States war. Ultimately, the study proposes a resilience framework for gold and silver mines under wartime conditions. The framework encompasses operational continuity, phased design and construction of processing plants, equipment maintainability and localization, strategic stockpiling of critical supplies, relative energy and financial independence, and the management of human resources and technical knowledge. In the cases examined, measures involving the provision of essential inputs, contractual support, and revisions to contract execution arrangements were associated with the continuation or resumption of project activities. The case study findings further indicate that timely interventions under force majeure conditions can help prevent project stoppages and declines in physical progress.
Keywords : war mining mineral processing plant sanctions risk crisis management