**An Intelligent Algorithm-Based Framework for Modeling and Optimizing Robust Scheduling of Urban Construction Projects under Uncertainty**
**An Intelligent Algorithm-Based Framework for Modeling and Optimizing Robust Scheduling of Urban Construction Projects under Uncertainty**
Vahideh Nemati1
1) M.Sc. in Civil Engineering – Earthquake Engineering, Tabriz Metropolitan Municipality, Tabriz, Iran Email:
IOI Code
:
ABZE-ABHFFG
Publication :
5th International Congress on Civil Engineering, Architecture, Building Materials and Environment(caucong.com)
Abstract :
Urban construction projects are inherently exposed to varying degrees of uncertainty, which can significantly affect their time, cost, and quality performance. Unexpected changes in weather conditions, delays in material supply, price fluctuations, and human errors are among the key factors that pose serious challenges to initial project planning. This study aims to propose a comprehensive framework for modeling and optimizing robust scheduling of urban construction projects under uncertainty. A mixed quantitative and simulation-based research methodology was adopted, with the statistical population comprising urban construction projects in the Tehran metropolitan area. To achieve the research objectives, a multi-objective optimization model was developed to simultaneously minimize project duration, maximize final profit, and maximize a surrogate robustness measure. The model was solved using a customized Non-dominated Sorting Genetic Algorithm II (NSGA-II). The findings demonstrate that robust schedules, despite a slight increase in planned project duration, significantly reduce time and cost deviations during project execution and improve schedule stability. The results of this study can assist urban construction project managers in making more informed decisions and effectively mitigating risks associated with uncertainty.
Keywords : uncertainty multi objective optimization genetic algorithm urban construction projects risk management