Stream and sediment modeling in mountain rivers

Stream and sediment modeling in mountain rivers

Yashar Ostovar Kashkooli1 Reza Mohammadi Motlagh2

1) PhD student of Civil Engineering Engineering and Water Resources Management, Civil Engineering Department, Marvdasht Branch, Islamic Azad University, Marvdasht, Iran.
2) Graduated from MSc in Water Resources Engineering and expert in Fars Regional Water Authority.

IOI Code : XACA-CDEDE
Publication : 2.nd International Congress on Contemporary in Civil Engineering, Architecture and Urban Development - Dubai(2dubaiconf.com)
Abstract :
    The Purpose Of This Study Was Simulation Of Water Flow And Sediment In An Interval About 20 Km From The Dalaki River. For This Purpose, After Providing Statistics And Information On The Flow Of The River And Checking Their Accuracy, With The HEC RAS Program , Simulated River Flow For Discharge With 2,5 And 10 Return Period Years. The Results Of This Study Showed That With Increasing River Flow (Increasing The Return Period),Numerical Value Of Some Hydraulic Arameters Such As Depth Of Water, Speed, Shear Stress And Froud Number Are Also Increased. In Addition, The Results Of River Sediment Modeling For Discharge With A Return Period Of 25 Years Showed That The Maximum Sedimentation Height As Well As The Maximum Depth Of Erosion Along The River Were 28 And 25 Cm Respectively, The Minimum Sediment Deposited Volume Was Equal To 5163.13 The Ton And Erosion Is Equal To 5467.52 Tons Per Day.

Keywords : dalaki river erosion larsen hec ras gis