Causes and effects of delay in design, fabrication and erection of huge steel structures in IRAN; Case study: Huge steel structures in ARDAKAN steel making plant
Causes and effects of delay in design, fabrication and erection of huge steel structures in IRAN; Case study: Huge steel structures in ARDAKAN steel making plant
Rezvan Valibeigi1 Mohammad Hasan Ebrahimi2 Farhad Noruzian3 Reza Jamalpoor Najmabad4
1) Head of Civil Dept., Lowshan Technical College (Ministry of Road and Urban Development Campus),
2) . M.Sc., Department of Civil Engineering- Construction Management, Karaj Branch, Islamic Azad University, Karaj, Iran,
3) . Faculty Member, Department of Civil Engineering- Construction Management, Karaj Branch, Islamic Azad University, Karaj, Iran,
4) . Faculty Member, Department of Civil Engineering- Construction Management, Karaj Branch, Islamic Azad University, Karaj, Iran,
IOI Code
:
XAHK-CFGHF
Publication :
2nd International Conference on New Horizons in the Engineering Science 9th August 2018 / Istanbul Turkey / Yildiz Technical University(eng2018.ir)
Abstract :
In the large industrial structures, at all levels, there is many complexity, that inform of effect rate and status of each part in the production of error, will help to optimize decisions. this article was carried out survey questionnaire and it has been paid to Common factors affecting on the error production sector and its ranking. The main factors affecting in the process of taken into consideration and project executive is including: client, consultant and contractor. In The ranking of the factors affecting the delay was used of Likert scale. Based on the results, in terms of total those questioned, Contractor with a correlation coefficient R2=2.992 has highest share in error production, rising costs and time of the project, Client and consultant ranked with R2=2.979 and R2=2.958 second and third respectively. Also in the related part the contractor, employer and consultant, respectively groups of supervision and quality control, budgeting and design are the most important factor. And the bad weather conditions is in the last rank.
Keywords : fault delay steel structure likert scale questionnaire survey