Wind turbines designed to provide electrical power supply portion facility master plan Sistan s villages.

Wind turbines designed to provide electrical power supply portion facility master plan Sistan s villages.

Gholam Hossein lakzaianpour1 Parvez Haghighatjoo2 Nima Lakzaianpour3

1) PhD student, Department of Irrigation and drainage water and soil, Zabol University. Department of Rural Water Supply Vabrsany water and sewage company, Sistan and Baluchestan
2) Department of Irrigation and drainage, water and soil Astadyarvzvhyyt Faculty, University of Zabol.
3) Electrical engineering student at the University of Birjand.

IOI Code : XAZA-BFBKD
Publication : The 2 International Conference on Erarth, Space and Clean Energy(attitude21.ir)
Abstract :
    Today, the world renewable energy sources, a special look. In Iran experts believe Andkh can be wind energy, Nvrkhvrshydvanrzhy heating operation so that the bulk of the country s energy needs be met. Sistan rural water supply master plan has several installation units is the average power consumed by these units, approximately 10665 MW per year is estimated. According to Badkhyzbvdn Sistan Vvjvdbadhay 120 days, using different energy Badjht power supply facilities, and the study has been economical to produce output equivalent to a 50 kW wind turbine design and selection is sent. The anticipated installation of wind turbines, can Zehak water treatment plant or pumping Azaystgah each is dependent on the level of Sistan region. The electricity produced can be used for power supply lighting systems installation units Nmvd.qbl Aztrahy design and construction of a wind turbine, financial evaluation and economic imperative appropriate power generated by wind energy Yd.mhasbh sensitive pedagogic Zakh m / s 10 is done in . The main criteria for the selection of the target area and Sayrparamtrhay Baddr wind turbines required in addition to the pace of the economy, providing optimal power Vdvrkhrvjy well. The electricity produced can be used for power supply lighting systems installation units Nmvd.qbl Aztrahy design and construction of a wind turbine, financial evaluation and economic imperative appropriate power generated by wind energy Yd.mhasbh sensitive pedagogic Zakh m / s 10 is done in . The main criteria for the selection of the target area and Sayrparamtrhay Baddr wind turbines required in addition to the pace of the economy, providing optimal power Vdvrkhrvjy well.

Keywords : wind turbine sistan winds the linear velocity tip windy area water supply projects providing brq yrvdynamyk