Evaluation of Precise Positioning Methods in Deep Excavation Projects
Evaluation of Precise Positioning Methods in Deep Excavation Projects
Mohsen Javadi1 Amin Sedaghat2
1) Department of Geomatics Engineering, University of Tabriz, Tabriz, Iran,
2) Department of Geomatics Engineering, University of Tabriz, Tabriz, Iran,
IOI Code
:
XBAE-DZGFK
Publication :
Demo - Website of Saman Conference Management System(ngtu.ir)
Abstract :
The precise positioning is a very important issue for the constructing and deformation monitoring in the excavation projects. Currently, simple positioning methods such as a conventional plane traverse are used in the majority of the excavation projects. A traverse is a series of connected lines whose lengths and angles at the junction points have been observed. For computational simplicity in a traverse, angular and distance conditions are used instead of the least square method. The low redundancy and not using of the least square adjustment can be reduced the accuracy and robustness of the traverse results. In this research, in order to assess the quality of positioning methods in excavation projects, the traverse method is compared with a precise control network positioning approach (micro-geodesy). Two deep excavation projects in Tehran, named “Golestan” and “Narges” with average height of 37 and 35 m, are considered to compare the capability of the traverse and control network. As expected, the positioning results indicate the low quality of the traverse method in comparison with the control network in terms of accuracy and sensitivity against outliers. Therefore, the preparing an applicable instruction in accordance with the excavation project properties is an essential requirement.
Keywords : excavation adjustment control network travers bowditch