Study the effects of using various methods of recruiting and monitoring the time, cost and safety of projects
Study the effects of using various methods of recruiting and monitoring the time, cost and safety of projects
Mohammad Akhavan1 Peyman Davari Dolat abadi2
1) Master of Science (MSc) in Civil Engineering, Construction Management Structure, Islamic Azad University of Dehaghan Branch
2) Faculty Member of Islamic Azad University, Dehaghan Branch
IOI Code
:
XBDG-DDDCD
Publication :
The 6th national Congress On Civil Engineering, Architecture & Urban Development(6icsau.ir)
Abstract :
One of the vital and important decisions for a manager of excavation project is choosing the method of cavity stabilization. The correct selection of stabilization method causes to increase confidence coefficient in lack of unacceptable displacement of cavity walls, decrease stabilization, eliminate probable losses, decrease the costs of stabilization and reduce the effective risks in cost and safety. This research aims to study the impacts of using different methods of excavation and brace component on the time, cost and safety of the projects. Therefore, some available and common methods for excavation of construction projects were described.The process of this research is as follows: At first, 15 civil engineers experts, geotechnical engineers, workshop and project supervisors were selected in the pre-study phase. At the first stage, an open questionnaire was formulated to identify the available methods of excavation. These questionnaire were given to the participants at the beginning of the workshop.The questionnaire was answered by the experts in writing and after completing the relevant matrix questionnaire, the data were analyzed using two methods of hierarchical analysis and topsis analysis. The results indicate that the time of operation of the recruiting component has the greatest effect on hierarchical outcomes. In terms of cost, human resources have the greatest impact Among the components related to cost, the component of mon-power cost has the most effect. In addition, equipment of individual protection has the most effect in safety. Finally, the best method was selected by Fuzzy Topsis technique. According to the results, the stanchion method was selected as the best method for the excavation because it has the least relative closeness of each option to the ideal solution.
Keywords : excavation the brace component technique ahp topsis