New Approaches to Decreasing Sitting Dams on Earth Using ICT and Its Impact on Increasing Dam Safety

New Approaches to Decreasing Sitting Dams on Earth Using ICT and Its Impact on Increasing Dam Safety

Salar Tirgar1 Hamidreza Mirmohseni2

1) Student of Geotechnical Engineering, Islamic Azad University, Science and Research Branch, Tehran, Iran
2) Student of Geotechnical Engineering, Islamic Azad University, Science and Research Branch, Tehran, Iran

IOI Code : XBDG-EZGGD
Publication : The 6th national Congress On Civil Engineering, Architecture & Urban Development(6icsau.ir)
Abstract :
    In case of failure, large projects such as dams, in addition to the huge financial costs, cause irreparable damage to the lives and lives of the people. Improper and uncontrolled operation not only wastes investment in dam construction but can also cause severe damage. Therefore, proper operation of dams is extremely important during operation. For this purpose, controlling the dam behavior during this period is the most important factor for achieving safe and sustainable status of dams as well as their proper operation. Tabarabad Abad Dam is located in northeast of Iran, 25 kilometers from Quchan city. The main purpose of constructing the dam is to supply agricultural water to some of the downstream areas of the dam as well as to supply part of Quchan drinking water. The dam height is 50 m, its length is 198 m and its height is 10 m. The volume of the dam reservoir at normal level is 60 million cubic meters. In the present study, first the data obtained from Tabarabad Abad Dam instrumentation from the beginning of construction up to now were collected and then the data were evaluated and monitored and the incorrect data were eliminated. The data were then transferred to Excel software and the corresponding charts were prepared. After preparing the graphs of the results, they were placed next to the field surveys and analyzed. At the end, after preparing the data and design parameters of the dam, the required information was transferred to Geo Studio software and the relevant model was prepared at different times and different water levels. For the exact purpose of the model, assuming that the data from the tools were correct, the analysis was performed and finally the results were compared with the results of the tools. The results show that most of the dam meetings are during construction and first dewatering and the total vertical settlement at the center of the core is estimated at 5 cm during operation. The valves in the dam have a good performance and in the present situation there is no possibility of hydraulic failure in the dam. In addition, the arc ratio in the lower core levels is about 0.52 and in the upper levels is about 0.7 and is considered acceptable.

Keywords : instrument hydraulic failure numerical analysis earth dam dam safety