Providing a Risk Analysis Method for Environmental Investigation of Karaj Dam in Operation Phase
Providing a Risk Analysis Method for Environmental Investigation of Karaj Dam in Operation Phase
Ramtin Sobhkhiz1 Alireza Mardookhpour2 Ebrahim Amiri3
1) M.sc of Civil Engineering Department,Islmaci Azad University of Lahijan,
2) Assistant Prof of Civil Engineering Department,Islamic Azad University of Lahijan,
3) Prof of Science of Water Engineering Department,Islamic Azad University of Lahijan,
IOI Code
:
XBGA-EZFHB
Publication :
The 1st International Conference on Civil Engineering, Architecture & Urban Regeneration(iccar.ir)
Abstract :
Large projects such as damping have many environmental risks both in operation and in the exploitation phase. Therefore, it is necessary to take appropriate measures to control and reduce the risk before dealing with the risks associated with these projects. The purpose of this study was to identify and classify the environmental risks caused by the construction of the Amir Kabir dam in the construction and exploitation phase. In this research, after identifying the risks, risk factors were prioritized by FMEA, assessment and risk based on the severity of the effect, the probability of occurrence and the extent of the contamination. The results of this study showed that the highest risk in the relevant operation phase And 52 water salinity and borrowing resources (erosion and sediment at the bottom of the dam) with a priority number of 280 and 300, respectively.
Keywords : environmental risk investigating karaj dam pha pro6 software operation phase