Environmental Risk Analys of Karaj Dam During Construction Phase with PHA_Pro6 Software

Environmental Risk Analys of Karaj Dam During Construction Phase with PHA_Pro6 Software

Ramtin Sobhkhiz Foumani,1 Alireza Mardookhpour2 Ebrahim Amiri3

1) 1-PhD Student of Civil Engineering Department, Qom University , Qom, Iran
2) Assistant Prof of Civil Engineering Department, Islamic Azad University of Lahijan , Lahijan , Iran
3) Prof of Science of Water Engineering Department, Islamic Azad University of Lahijan , Lahijan , Iran

IOI Code : XBKD-EZKHB
Publication : 3th. International Congress on Contemporary in Civil Engineering, Architecture and Urban Development(cautech.ir)
Abstract :
    Large projects such as damping have many environmental risks both in operation and in the exploitation phase. Therefore, it is necessary to take appropriate measures to control and reduce the risk before dealing with the risks associated with these projects. The purpose of this study was to identify and classify the environmental risks caused by the construction of the Amir Kabir dam in the construction and exploitation phase. In this research, after identifying the risks, risk factors were prioritized by FMEA, assessment and risk based on the severity of the effect, the probability of occurrence and the extent of the contamination. The results of this study showed that the highest risk during construction of the dam was related to the construction of roads, exhaust gases from cars and excavation and excavation with the priority number of risk (RPN), 280, 252 and 120

Keywords : environmental risk analys karaj dam pha pro6 software construction phase