Necessity of using the life cycle and determining the economic life of equipment in the effectiveness of the p.m system and the readiness of offshore vessels (case study of the General Administration of Ports of Khuzestan Province)
Necessity of using the life cycle and determining the economic life of equipment in the effectiveness of the p.m system and the readiness of offshore vessels (case study of the General Administration of Ports of Khuzestan Province)
ALI MOARECHIPOUR1 MAHMOOD SALEHI2
1) Mechanical expert of the General Administration of Ports and Maritime Affairs of Khuzestan Province
2) Head of Marine Equipment Repair Shop of Imam Khomeini Port
IOI Code
:
XCCA-FEBDA
Publication :
9th International Conference on Advanced Research in Science, Engineering and Technology(setconf.ir)
Abstract :
Naval vessels are one of the most basic assets and strategic equipment of any port. In our dear country, due to the cruel sanctions, it is not possible to modernize the navy at an affordable cost, so we must use all available technical knowledge to maintain Used naval vessels at best ready for use. Repairs sometimes do not meet the operational needs due to the age of the equipment, and the desired number of ready-to-use repairs is not achieved. Therefore, the best method is to classify actions and repairs based on the life of the equipment. In this article, many indicators have been mentioned. In many cases, repairs are not economically justified and the next steps should be in order to optimize the equipment. Determining the economic life of equipment based on life cycle costs reduces human error and increases accuracy, transparency and speed, and determining the economic life of equipment reduces costs and decision risk and increases the efficiency of the organization, also one of the important issues in logistics decisions. The organization is to determine the optimal time to use the equipment. To make the right decisions, the managers of the organization must know when is the best time to replace or replace the equipment by removing it from the organization, so that it has the most benefits and the least cost for the organization. In this regard, it is necessary to identify the life cycle costs and perform calculations to determine the optimal life of the vessel.
Keywords : equipment readiness time between two failures overall equipment effectiveness life cycle