Use of local cameras in automatic monitoring of construction projects based on building information modeling (BIM) and machine vision system to improve project performance
Use of local cameras in automatic monitoring of construction projects based on building information modeling (BIM) and machine vision system to improve project performance
Amir Hossein Dalir1 Siamak Haji Yakhchali2 Alireza Aghighi3
1) Master of Architectural Engineering, majoring in Construction Arts: Project Management and Construction of Hamadan University College of Civil and Development: Iran
2) PhD in Project Management, University of London, UK, Assistant Professor and Faculty Member, University of Tehran: Iran
3) PhD in Management, of Tehran: Iran, Assistant Professor and Faculty Member of Payame Noor University
IOI Code
:
XCCA-GCKAK
Publication :
9th International Conference on Advanced Research in Science, Engineering and Technology(setconf.ir)
Abstract :
Despite recent advances in technology and equipment to monitor automated progress, most construction companies around the world do not use them for their projects. This can be due to many reasons, such as the high cost of technologies and equipment, the need for skilled personnel, and the lack of sufficient information on automatic progress monitoring to control project performance, building information modeling (BIM) allowing new levels of spatial visualization, and project management Gives more efficiency. Despite the benefits of BIM, its proper implementation in projects faces challenges such as time consuming, manual data entry process, and model updating. In countries such as Iran, where BIM is not widely implemented, BIM-based project planning, however, will be more difficult than traditional methods such as the Critical Path Method (CPM), due to the large number of relevant planning parameters. The purpose of this study is to investigate the effect of machine vision using local cameras as an executive data collection system on automatic progress monitoring based on building information modeling to improve key performance indicators of the project (time, cost and quality planning). According to the text and sample, the subject of the nature of applied research is the research method used analytically-descriptively and the library method has been used with the tools of articles, books, dissertations, documents and continuous studies. The research findings confirm the positive impact of local cameras on automated progress monitoring based on building information modeling on real, accurate and cost-effective performance and show how automated progress monitoring affects the success of a construction project.
Keywords : machine vision project progress monitoring local camera building information modeling construction project management