Optimization of Sirjan Gol-E-Gohar Iron Ore Mining and Stripping System Using ANP and TOPSIS Techniques
Optimization of Sirjan Gol-E-Gohar Iron Ore Mining and Stripping System Using ANP and TOPSIS Techniques
Hamidreza Salemi Parizi1 Mohsen Mohammadizadeh2
1) 1. Master s degree student in Construction Management, Sirjan Branch, Islamic Azad University, Sirjan, Iran. Email:
2) 2. Member of the faculty of Civil Engineering Department, Sirjan Branch, Islamic Azad University, Sirjan, Iran. Email:
IOI Code
:
XCZG-EFCKE
Publication :
International Conference on Civil Engineering, Architecture , Development and Recreation Urban Infrastructure in Iran(icdu.ir)
Abstract :
Strip mining is a surface mining method that is preferably used for metal mines, mainly copper and iron. In this method, extraction continues step by step and to a depth of mineral storage, which is an economic operation. In this method, the extraction is removed from the surface of the mine until access to the mineral is obtained. Extraction on the mineral after extraction must be carried out mainly outside the mine area and where there is no possibility of mineral presence and stored there. This study aims to optimize the Sirjan Gol-E-Gohar Iron Ore removal system using Analytical Network Process (ANP) and Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) techniques. The research method surveys. The required information has been collected through a questionnaire and interviews with managers and engineers at Gol-E-Gohar Iron Ore in Sirjan. ANP and TOPSIS techniques have been used to optimize the Gol-E-Gohar Iron Ore removal system in Sirjan. The results showed that the rate of crushing and adhesion of the removal was the most important, the factor of technical knowledge in the second priority, the factor of the physical texture of the removal material in the third priority, the factor of water access in the fourth place and the factor of equipment capacity in the last priority.
Keywords : waste removed gol e gohar iron ore multiple placement techniques anp topsis