Pathology of construction projects exploited in Gilan province (Case study of the Housing Foundation of the Islamic Revolution)
Pathology of construction projects exploited in Gilan province (Case study of the Housing Foundation of the Islamic Revolution)
Javad Rahimi Salkouyeh1 Alireza Mansouri2 Seyed Mohsen Moghaddasi3 Hamidreza Naser Saeed4
1) Civil Engineering Master of Civil Engineering, Allameh Mohaddes Nouri Non-Profit University, Noor, Iran
2) Member of the faculty of the Department of Civil Engineering, Allameh Mohaddes Nouri University
3) Allameh Mohaddes Nouri University lecturer
4) Member of the faculty of the Department of Civil Engineering, Allameh Mohaddes Nouri University
IOI Code
:
XCZG-EGKEE
Publication :
International Conference on Civil Engineering, Architecture , Development and Recreation Urban Infrastructure in Iran(icdu.ir)
Abstract :
Every year, billions of rials are spent on the study, implementation and operation of development projects in the country. Studies show that most construction projects are not completed on time and unnecessary and unforeseen costs are imposed on the project; Some of the problems facing development projects can be considered as follows: poor planning and project control, limited financial and time resources, lack of attention of employer and consultant to the goals of poor supervision plan and inappropriate evaluation of inappropriate selection of contractors and executives. Standards and lack of timely allocation of funds, which fully understand the problems and obstacles governing development projects and effective factors that have caused such problems, can reduce costs, save credit and use at the right time. In this regard, comprehensive planning, evaluation and proper control of all stages of the development of a project, plays an important role in controlling and reducing unnecessary costs. In this study, an attempt has been made to identify the construction projects of the General Administration of the Housing Foundation of Guilan Province. In this way, the most important deterrents in the untimely realization of construction projects are identified. This research is applied in terms of purpose and its research method is descriptive. The researcher also used the distribution of the questionnaire as the main collection tool in order to obtain the data needed to test the hypotheses. IBM SPSS Statistics software is used to analyze the data obtained from the questionnaire.
Keywords : construction projects contractor consultant employer housing foundation