Evaluating the safety risks in projects of mass production by Vikor method (Case study: North Khorasan Province, Mehr housing of Farauj city)
Evaluating the safety risks in projects of mass production by Vikor method (Case study: North Khorasan Province, Mehr housing of Farauj city)
Sajad Ebrahimi1 Majid Mojahed2
1) Master s student in Civil Engineering, Engineering and Construction Management, Islamic Azad University, Shirvan Branch, Iran
2) Invited Assistant Professor, Islamic Azad University, Shirvan Branch, Iran
IOI Code
:
XCZG-EHZEB
Publication :
International Conference on Civil Engineering, Architecture , Development and Recreation Urban Infrastructure in Iran(icdu.ir)
Abstract :
The existing risks in construction projects in mass production are higher than in conventional constructions; therefore, evaluating the risks is more important in these types of projects. Due to the issues of safety in mass production and Mehr housing maybe is evaluated properly, so it should be increased the awareness of technical and engineering information in this regard. In this study, safety risks in projects of Mehr housing and mass production are evaluated. in this study, risk evaluation was performed using the opinion of 20 experts in the field of mass production and Mehr housing, so that first the main risks were identified through existing checklists (based on past researches) and interviews with experts, too; then weighted through the pair wise comparison matrix method. The two criteria considered in this study are the probability of occurrence of C1 and the effect of C2 that after the performed calculations, the probability of occurrence with normalized weight of 0.579 placed in the first priority and the criterion of effect with weight of 0.403 placed in the second priority. Then, the priority of response to the risks was evaluated by using the Vikor method as one of the multi-criteria decision-making methods. In this study, 10 risks were identified that work at height option and unexpected events option placed in first and second priority, finally the concrete skeleton installation placed in tenth priority, respectively. After prioritizing the risks, critical risks were identified and answered.