Engineering and Risk Management in BOT Projects
Engineering and Risk Management in BOT Projects
kaveh kooch pi deh1 maral sarraf2
1) M.Sc. Student in Construction Management, alaoddoleh Semnani University
2) PhD student in Geography and Urban Planning, University of Tehran
IOI Code
:
XCZH-EGFFE
Publication :
3rd. International Conference on Civil Engineering, Architecture and Urban Development Management in Iran(caumconf.com)
Abstract :
One of the solutions to the dilemma of providing capital for the implementation of development projects is the use of BOT . build, operation and transfer contracts. This approach allows the private sector to participate in public and private infrastructure projects without ever having to own infrastructure projects. The differentiating aspects of BOT projects over other projects are the risk-sharing system, so that the responsibilities and duties of each project agent in this approach are relatively clear and, after identifying the risks and assessing the capability of the project agents, Risks are divided between project factors. The key factor in assigning each risk to each of the project s factors is its ability to control and manage risk.
Keywords : civil projects risk management project agents bot