Pathology of construction projects exploited in Guilan province by Barvikord TOPSIS (case study of the Housing Foundation of the Islamic Revolution)

Pathology of construction projects exploited in Guilan province by Barvikord TOPSIS (case study of the Housing Foundation of the Islamic Revolution)

Javad Rahimi Salkouyeh1 Alireza Mansouri2 Seyed Mohsen Moghaddasi3 Hamidreza Naser Saeed4

1) Civil Engineering Master of Civil Engineering, Allameh Mohaddes Nouri Non-Profit University, Noor, Iran
2) Member of the faculty of the Department of Civil Engineering, Allameh Mohaddes Nouri University
3) Allameh Mohaddes Nouri University lecturer
4) Member of the faculty of the Department of Civil Engineering, Allameh Mohaddes Nouri University

IOI Code : XCZH-EHFDK
Publication : 3rd. International Conference on Civil Engineering, Architecture and Urban Development Management in Iran(caumconf.com)
Abstract :
    Every year, billions of rials are spent in the country to study, implement and exploit development projects. Studies show that most construction projects are not completed on time and unnecessary and unforeseen costs are imposed on the project; Some of the problems facing construction projects can be listed as follows: Weak planning and project control, limited financial resources and time, lack of attention of the employer and consultant to the objectives of the project, poor monitoring and inappropriate evaluation, improper selection of contractors and executives, lack of attention to Standards and lack of timely allocation of funds that fully recognize the problems and obstacles to development projects and the factors that have caused such problems, can reduce costs, save credit and operation at the right time. In this regard, comprehensive planning, evaluation and proper control of all stages of the development of a plan, plays an important role in controlling and reducing unnecessary costs. In this study, an attempt has been made to study the pathology of construction projects of the General Directorate of Housing Foundation of Guilan Province. In this way, the most important deterrents in the non-timely realization of construction projects are identified. This research is applied in terms of purpose and its research method is descriptive. The researcher also used the distribution of questionnaires as the main collection tool in order to obtain the data needed to test the hypotheses. TOPSIS software was used to analyze the data obtained from the questionnaire. According to the analysis, the economic dimension with 77.5% impact is the most important factor in the non-realization of the projects of the General Administration of the Housing Foundation of the Islamic Revolution.