Identification and evaluation of factors affecting the separation of waste from the source with theme analysis technique (Case study: Ahvaz households)

Identification and evaluation of factors affecting the separation of waste from the source with theme analysis technique (Case study: Ahvaz households)

Somayeh Shakiba Moghadam1 Zahra Khazaei2

1) Graduate student, Department of Urban Management, Ahvaz Branch, Islamic Azad University, Ahvaz, Iran
2) Assistant Professor, Department of Urban Management, Ahvaz Branch, Islamic Azad University, Ahvaz, Iran

IOI Code : XDHH-GFHCK
Publication : 5th.International Conference & 6th.National Conference on Civil Engineering, Architecture, Art and Urban Design(5iccacs.ir)
Abstract :
    In recent decades, one of the consequences of urbanization and population growth has been the widespread production of solid waste. Solid waste is one of the most important environmental pollutants that human societies face. Inadequate waste management can lead to soil and water pollution, greenhouse gas emissions and negative effects on human quality of life. Waste separation plan from the source is one of the plans that is implemented in order to develop municipal waste management and reduce health and environmental problems and problems caused by improper collection and disposal of municipal waste. The main purpose of this study is to identify the factors affecting the separation of waste from the source in the city of Ahvaz, and rank them in terms of importance. The research method is applied in terms of purpose and hybrid in terms of nature (qualitative and quantitative). In the first stage, using interview tools and theme analysis techniques, the factors affecting the participation of citizens in the separation of waste from the source were identified. The output of the first part of the research included 5 factors and 20 effective components. The statistical population of the study at this stage was housewives. In the second stage of the research, using a researcher-made questionnaire, the model was evaluated and validated. Finally, using AHP technique, the factors were ranked in terms of importance.

Keywords :