Risk Management in Oil & Gas Projects In Order To Consider Them In Tendering Process and Provide Executive

Risk Management in Oil & Gas Projects In Order To Consider Them In Tendering Process and Provide Executive

شیما رضایی مفرد1

1) کارشناسی ارشد مدیریت ساخت

IOI Code : XDHH-GFKFH
Publication : 5th.International Conference & 6th.National Conference on Civil Engineering, Architecture, Art and Urban Design(5iccacs.ir)
Abstract :
    Due to the major investments carried out in large volume projects such as oil and gas projects, bidding is one of the most important issues and inadequate and inefficient management of the bidding process causes irreparable damages to the project execution. The knowledge harvested from the identification and assessment of risks in the pre - project phases such as the prequalification and bidding process can reduce or prevent the risks occurring in the project execution stage. The purpose of this study is to identify the risks that affect the tenders of oil and gas projects and will be designed and implemented in a case study, assessment and risk management in a purchasing in one of the oil projects in the south pars region. In this study, the risks associated with the process of bidding are classified using the RBS breakdown structure and it result is implemented in part of the purchase of an example of a sale contract in the oil and gas industry. Then, a qualitative and quantitative risk analysis have been done using Primavera Risk Analysis Software and based on risk management model in the PMBOK standard. The results of the study showed that out of 59 identified risks 18 had higher priority. The critical risks that have the highest probability and impact on project objectives in terms of time and cost and performance were determined in the tender stage and its effects on the bidding process were determined. These risks have been identified in terms of critical risk in terms of financial and technical specifications before floating tenders or risk of clear definition of technical specifications and conditions in terms of financial and technical capacity, knowledge and technology. Finally, solutions such as forecasting performance indicators and contractors evaluation criteria in terms of financial and technical capacity, forecasting and allocating resources for the time and cost of the project before tender, which will reduce the impacts and probability of their occurrence in the execution of the project

Keywords : risk management risk identification tender and technical assessment tender management tender risk