Evaluate the IMS project management system in selecting the top contractors for construction projects

Evaluate the IMS project management system in selecting the top contractors for construction projects

Amin Ghorbani Chegeni1 Davood Goodarzi2

1) Amin Ghorbani Chegni Azad Boroujerd University, Department of Civil Engineering
2) Davood Goodarzi, Boroujerd Azad University, Department of Civil Engineering

IOI Code : XDHH-GGZHE
Publication : 5th.International Conference & 6th.National Conference on Civil Engineering, Architecture, Art and Urban Design(5iccacs.ir)
Abstract :
    The purpose of this study is to analyze the scope of initial evaluation of the selection of contractors in the IMS range of project management knowledge modules. According to previous statistics in the implementation of construction projects, the amount of outsourcing of different fields of the PLC project construction cycle to contractors has increased significantly compared to the past, which has increased the transfer of risks and responsibilities from the employer team to the contractor. According to the indicators, evaluation in the selection of contractors will cause many CLAIM claims and challenges, as well as incompleteness of the project and increase irreparable human and financial losses for the employer and the community. The contractor sample was analyzed. Fuzzy logic as a powerful and flexible tool to evaluate this index is able to mathematically formulate even uncertain and inaccurate parameters and make a final evaluation. . Keywords: Claims - Project Life Cycle - IMS - Contractors Evaluation Indicators

Keywords : claims project life cycle ims contractors evaluation indicators