Investigating economic projects through delays and their causes
Investigating economic projects through delays and their causes
sanjar salajeghe1 shahin sharafi2 soghra alipoor3
1) Associate Professor and Board Member of Islamic Azad University, Kerman Branch, Faculty of Literature and Humanities
2) Assistant Professor, Department of Management, Kerman Branch, Islamic Azad University, Kerman, Iran
3) PhD student in public administration, majoring in decision-making and public policy, faculty of literature and humanities, Islamic Azad University, Kerman branch, Kerman, Iran
IOI Code
:
XGFB-KHHBG
Publication :
9th.International Congress On Civil Engineering, Architecture & Urban Development(9icsau.ir)
Abstract :
The purpose of this research was to investigate the economic risk of construction projects through delays and their causes. This research is applied in terms of its nature and descriptive-survey method. The data collection tool was library and field. A statistical sample of 271 people was selected based on Cochran s formula. The time frame of this research is 1398-1402 in the city of Mashhad. The method of data analysis includes descriptive statistics and inferential statistics using spss software. The findings of the research show that the complexity of technology, weakness in executive management, large volume of expenses and failure to pay salaries on time are factors that can predict economic risk. Also, the results show that urban construction project delays are significantly effective in reducing economic risk from the point of view of contract factors.
Keywords : delays urban construction projects contract factors economic risk mashhad municipality