Project management engineering

sima mousavi1

1) Azad University of AHAR

IOI Code : XGZK-HHEBC
Publication : 7th International Conference on Applied Researches in Science & Engineering (7carse.com)
Abstract :
    Abstract: The acceleration of developments in the fields of scientific, political, economic, social and cultural civilization leads to the achievement of progress, a process of pre-programming for the future of participation research. In the challenging process and difficult passage, the internal resources and opportunities are not enough to move by their own will and reach the destination. In addition, all the requirements of the route at the same time and at a specific moment do not have the same importance and priority. A recommendable criterion, idea and mechanism for all nations is to exploit their scientific, economic, social, cultural and symbolic funds and resources with efficiency and effectiveness. Such recommendations for the Islamic Republic of Iran are the entry of all material and spiritual civilization assets in the process of progress. In this article, with positivist guidance and the use of documents and experiences and the application of systemic thinking, a mechanism for national division of labor has been developed to start the process of implementing the Iranian Islamic development model. Based on the fate of the existing national documents, it will be impossible, difficult or even impossible to move in an impossible pattern without a precise and monitor-able preparation of the conditions, must and measures. The mechanism presented in this article, using the methods of systems analysis, process management and project management, the Iranian Islamic model of progress as a comprehensive system , is firstly analyzed and divided into several meaningful systems , subsystems and activities . Secondly, the main and partner national institutions in charge of implementing each of the systems, subsystems and determining activities, thirdly, a flexible timetable for the implementation of each of the executive activities, monitoring and performance reporting are designed and deployed.

Keywords : iranian development model project system thinking process management national division of labor