Evaluation of the technical parameters of the hot asphalt mixing plan of Binder and Topeka layers
Evaluation of the technical parameters of the hot asphalt mixing plan of Binder and Topeka layers
Salar Tirgar1 Amin Fathalipour2 Mehdi Ghanimati3
1) MSc Geotechnical Civil Engineering, Islamic Azad University, Science and Research Unit, Tehran, Iran, Quality Control Manager, Research and Development Laboratory of Asphalt kordan research and production complex
2) MBA, University of Tehran, Iran, Manager of Asphalt kordan research and production complex
3) Ph.D. in organic chemistry, Islamic Azad University, Arak branch, Iran, expert in petroleum and petrochemical industries, National Organization of Iranian Standards
IOI Code
:
XHDH-KGGEK
Publication :
3rd International Congress on Civil Engineering, Architecture, Building Materials and Environment(caucong.com/3rd)
Abstract :
Transportation and roads are an inseparable part of human life today, and in this field, common pavements, especially asphalt mixture, have greatly helped to improve this part of people s lives. Asphalt concrete or in short asphalt is a mixture of stone materials, filler It is bitumen, which is used as a protector of road bodies in pavements, and it has increased the quality of measuring the comfort of roads. Asphalts are divided into different layers in terms of resistance indicators, the most important of which are the binder layer and the topka layer. The binder layer is placed between the top layer and the base layer, and the top layer is the last asphalt layer of the pavement, which is in direct contact with loads from traffic and atmospheric and environmental factors. It is one of the important and effective factors on the quality of the mixture. Asphalt materials can be the type of stone material and its construction, the type of stone material granulation, the type and amount of bitumen used, as well as the method of mixing, transporting and implementing it. and also all laboratory requirements and standards have been met.
Keywords : asphalt mixture warm asphalt topeka binder marshall mixing plan