Evaluating the extraction method and determining the ultimate pit limit in the Mazraeh-Shadi gold mine, Varzeghan, East-Azerbaijan

Evaluating the extraction method and determining the ultimate pit limit in the Mazraeh-Shadi gold mine, Varzeghan, East-Azerbaijan

Yaser Afsharmanesh1 Ali Alizadeh2 Said Azizi3 Iraj Ghorbani4 Vahideh Mehri5

1) Ph.D. student in Economic Geology, Islamic Azad University, North Tehran Branch, Tehran, Iran,
2) Ph.D. in Tectonic Geology, Islamic Azad University, North Tehran Branch, Tehran, Iran,
3) Master of Mining, Islamic Azad University, Varzeghan Branch, the Sungun Copper Mine, Varzeghan, Iran.
4) Master of Mining, Islamic Azad University, Varzeghan Branch, the Sungun Copper Mine, Varzeghan, Iran.
5) Master of engineering geology, Islamic Azad University, Ahar Branch,

IOI Code : XKBA-AZKBAD
Publication : 3rd International Conference on Recent Advances in Engineering, Innovation and Technology - Belgium(eitconf.com/3rd)
Abstract :
    The present research was conducted in order to investigate the Evaluating the extraction method and designing the ultimate pit limit in the Mazraeh-Shadi gold mine, Varzeghan, E-Azerbaijan. The main objectives of this research are to investigate the extraction method in the Shadi farm gold mine and to choose the optimal extraction method according to the condition of the mine in order to prevent the destruction of the land surface and protect the environment and natural resources and to examine the design of the final pit of the Shadi field gold mine in order to reduce the cost. Investments and operational costs of mining are aimed at attracting investors and helping to create jobs. The results of these surveys showed that the amount of mine reserve is equal to 213102 tons according to the calculations. According to the investigations, three mining plans were proposed in an open and staggered manner, taking into account the amount of mineral matter and tailings. In these calculations, the final slope is 40 degrees, the width of the safety stairs is 8 meters, the slope of the stairs wall is 70 degrees, and the height of the stairs is 10 meters without considering the ramp. Also, based on the current studies, the extraction of the lower part of the gold ore of the Shadi field from the level of 1850 to 1910 meters in terms of the steep slope, low thickness, and long length was not recognized for the cost-effective open pit mining.

Keywords : mine pit the extraction method the thickness of the ore the mazraeh shadi gold mine varzeghan northwest of iran