Presenting a multi-objective mathematical model of scheduling in manufacturing projects using the unbeatable ranking genetic algorithm (NRGA)

Presenting a multi-objective mathematical model of scheduling in manufacturing projects using the unbeatable ranking genetic algorithm (NRGA)

Sajad janbaz1 sayyed mohammadreza davoodi2

1) PhD Candidate of Industrial Management, Department of Management, Dehaghan Branch, Islamic Azad University, Dehaghan, Iran.
2) Department of Management, Dehaghan Branch, Islamic Azad University, Dehaghan, Iran

IOI Code : XKHB-AAZHCK
Publication : Annual Conference on Hekmat-Based Architecture, Urban Development, Art, Industrial Design, Construction and Technology(icahu.com)
Abstract :
    Project scheduling and allocation of financial resources is one of the main challenges in project-based organizations, so that in these organizations, allocating financial resources to projects despite several implementation plans is one of the most important decisions in these organizations. As we know, project-based organizations have several parallel projects that can start planning in parallel, and most of these companies face financial crises in order to bring projects to fruition. On the other hand, completing implementation projects and handing them over to the sponsor or employer brings the organization a suitable profit. In the event of inappropriate selection of projects to start and lack of integration between financial resources, in addition to causing loss of resources and energy of the organization, it causes failure of the organizational structure and stopping of current projects and much higher losses in the organization. Therefore, in this study, a multi-objective mixed integer nonlinear programming (MINLP) mathematical model was presented. The mathematical model of this study includes multiple objectives of maximizing the profit from selecting a production project, minimizing the cost and implementation risk of projects. Information related to the parameters of the mathematical model was used based on receipts from the construction and manufacturing company. Finally, the presented model was evaluated and validated with the NRGA algorithm, and in the validation conducted based on the performance of the optimal solutions, it was shown that this algorithm has high efficiency

Keywords :