Examining the problems and causes of delays in the operation of infrastructure projects In the world

Examining the problems and causes of delays in the operation of infrastructure projects In the world

Seyyed Mostafa Siyadati1 ashkan sadeghian2 Maryam Anabestani3

1) Master s student in Project and Construction Management, Shahid Beheshti University, Tehran, Iran
2) Master s student in Project and Construction Management, Shahid Beheshti University, Tehran, Iran
3) Master s student in Project and Construction Management, Shahid Beheshti University, Tehran, Iran

IOI Code : XKHB-AZAGDF
Publication : Annual Conference on Hekmat-Based Architecture, Urban Development, Art, Industrial Design, Construction and Technology(icahu.com)
Abstract :
    Today, an important part of the assets of countries, especially developing countries, is dedicated to their infrastructure projects, and one of the most important factors affecting the economic growth and development of countries is the success in the implementation of infrastructure projects. The most important problem that these projects are facing is the time delay in the completion of the project, however, if the operation of these projects is delayed, in addition to the waste of national funds, many of them will lose their technical and economic justification. Therefore, the issue of delay is considered as one of the common, costly, complex and risky issues in the construction industry all over the world. Delay generally occurs in all projects and its size varies significantly in different projects, with the increase of project implementation time, their cost will subsequently increase, and the losses due to not completing the project on time will result in very high costs. The project will impose. On the other hand, the occurrence of time delay as well as an increase in the cost of project construction can have negative effects on the quality of the project, therefore, identifying and rooting the causes of delays in projects is very important and necessary so that we can minimize their negative effects. Investigating the causes of time delays and cost increases can be of great help to project management in order to perform future projects as well as possible. Therefore, identifying and rooting the causes of delays in projects is very important and necessary so that we can minimize their negative effects, also investigating the causes of time delays and cost increases can be a great help to project management in order to carry out future projects as well as possible. and by identifying the important factors that cause delay, provide an effective solution to reduce or eliminate them. Many studies have been conducted regarding the investigation and recognition of the root factors of deviation of projects from the initial time and cost format. Deviation of cost and time has been identified as effective from three factors: 1) technical, 2) psychological, 3) political-economic. But according to the investigation of psychological effects in the fields of mental biases,And by identifying the important factors that cause it, the elimination method provides a way to reduce them. Many studies have been conducted regarding the investigation and recognition of the root factors of deviation of projects from the first time and cost format. Deviation of cost and time, treatment has been identified from three factors: 1) technical, 2) psychological, 3) political-economic. But according to the investigation of psychological issues in the areas of mental biases, in these researches it will be done on technical issues, and a passage on political issues and their economic effects on possible time changes and deviation of their costs will be required to investigate the possibility of occurrence. The results in the exploitation of infrastructure projects have been dealt with in numerous articles published by several researchers.

Keywords : infrastructure project infrastructure delay causes problems