Analysis of control principles in a planning and management system of urban construction projects with a chronological approach
Analysis of control principles in a planning and management system of urban construction projects with a chronological approach
ghasem Darvishi1
1) Civil engineering expert in Shiraz municipality s urban services department,
IOI Code
:
XKHB-AZCGFA
Publication :
Annual Conference on Hekmat-Based Architecture, Urban Development, Art, Industrial Design, Construction and Technology(icahu.com)
Abstract :
With a little precision in the various and common factors proposed as the reasons for creating deviations in construction projects, it can be seen that almost all of the mentioned cases are caused by the weakness of the planning system in the projects. In such a situation, it is not possible to solve the problem directly. He realized that this problem can be rooted in the planning department for many reasons. The use of management knowledge is one of the effective tools that without the need for hardware, relying on knowledge, has an effective increase in the improvement of construction activities, which is introduced in Iran. It has been done slowly. The improvement of common planning in civil works is an effective step in the excellence of construction management. The common expensive ideal leads planners and managers into a path that leads to a continuous increase in deviation from the plan due to the repetition of intensive and unrealistic planning, and will ultimately increase the rate of rework and waste in projects. While in the management literature, the purpose of the control stage is to investigate the deviation from the plan and identify the factors that cause this deviation to prevent their repetition and return to the planned progress, it is observed from the investigation of the deviation from the plan of national construction projects in different years. It is possible that the percentage of deviations from the plan in the past years has not only remained constant, but almost every year it has faced a slight increase compared to the previous year. One of the effective factors in the delay of construction projects is the nature of the planning of these types of projects, which has been less discussed.
Keywords : project control project management scheduling planning urban construction activities