Managing the construction of bridges for the construction of bridges with the approach of reducing costs and providing relief and military purposes
Managing the construction of bridges for the construction of bridges with the approach of reducing costs and providing relief and military purposes
Mohammad Hadi Khorsandi1 Babak Hemmati2 , Masoud Baniani3
1) Head of Asphalt and Road Construction Department of Shiraz Municipality,
2) Shiraz Municipality s General Civil Manager,
3) Head of Shiraz Municipal Facilities Department,
IOI Code
:
XKHB-AZCGFD
Publication :
Annual Conference on Hekmat-Based Architecture, Urban Development, Art, Industrial Design, Construction and Technology(icahu.com)
Abstract :
The construction and implementation of bridges in the usual way that requires step-by-step construction, depending on the dimensions and importance of the bridge, takes from a few months to more than a year in our country. In this method, it is necessary to pass the necessary time for the concrete to set after pouring the concrete parts (which are generally of this type, such as foundations, bases, and bags) and then the next step is implemented. This requires a lot of time, more manpower and ultimately more cost. On the other hand, the idea of building prefabricated bridges, which is currently being pursued with great seriousness in developed countries, has been able to greatly reduce the time and cost of constructing footbridges and increase the health and safety of human resources and reduce contamination. be the environment In some cases, due to the short time available to bridge builders, using prefabricated bridges is the only available solution. Among these cases, it is possible to mention the construction of bridges in the places of busy and important intersections, where it is not possible to cut off the traffic flow easily. The rapid construction of bridges for military and relief purposes is also one of the other uses of these bridges, which can be built in the place of destroyed bridges or to create a new access route. The bridges that will be built with the purpose of helping in exceptional conditions and the occurrence of unexpected events, are mainly related to the bridges destroyed during floods or earthquakes, and it is necessary to consider their specific environmental conditions. In any case, in cases where the need to build a bridge and its location cannot be predicted in advance, it is necessary to categorize the construction conditions and different dimensions of bridges and to build prefabricated bridges that can meet the desired needs. Prefabricated parts should be stored in appropriate warehouses and according to the designer s considerations.
Keywords : bridge relief construction management military purposes cost reduction