Examining the challenges of the private and public partnership contract in the BOT way from a technical and legal perspective in Iran
Examining the challenges of the private and public partnership contract in the BOT way from a technical and legal perspective in Iran
Saeed Farrokhizadeh1 Mohammad erfan Rahimi Lavasani2
1) Assistant Professor, Department of Civil Engineering - Management, Islamic Azad University, Tehran branch, South of Iran,
2) Master s student, construction management researcher, Islamic Azad University, South Tehran Branch, Tehran,
IOI Code
:
XKHB-AZHECZ
Publication :
Annual Conference on Hekmat-Based Architecture, Urban Development, Art, Industrial Design, Construction and Technology(icahu.com)
Abstract :
What developing countries are struggling with today is the issue of financing infrastructure projects and public welfare. Such projects are very effective on the level of public satisfaction, but taking advantage of this such as contracts, which sometimes the investor party is a foreign party, requires the existence of political, economic, cultural and social infrastructures. The mention of all the cases and contents indicates that non-borrowing financing such as BOT always has an inherent risk. They are and It requires the definition of codified executive and pre-executive frameworks. In the upcoming research, we will examine the approach of our dear country, Iran, and the past procedures in this kind of contracts (participation of the public and private sectors) and that currently the amount of use of these contracts In what way, we are currently able to host successful investments in line with the national development vision document and empowering the vital infrastructure of our country, and this requires targeted investment for the proper movement of capital to The direction of such projects and creating a win-win approach.
Keywords : non borrowing financing private and public sector partnership contracts bot ppp boot