overbreak to investigate the stability of tunnel boring and tunnel case study Fitr 6 chromite mine in Faryab
overbreak to investigate the stability of tunnel boring and tunnel case study Fitr 6 chromite mine in Faryab
javad salari1 Mohsen soliman dehkordi2 mojtaba devazdah emami3
1) Master quarry mining orientation instructor Islamic Azad University, Zarand:
2) Department of Civil Engineering, Islamic Azad University of Yazd Bafg
3) Master of Engineering student orientation Vpy soil, Islamic Azad University of Yazd Bafg
IOI Code
:
XYAH-ZDAHA
Publication :
3rd international conference of Science and Engineering(3icesconf.com)
Abstract :
The explosion of a process is inherently destructive to dig the tunnel, causing problems such as over break drilling, the amount of over breakl drilling to an average depth or as a percent cross-section of the cross-section is designed to be expressed, to evaluate the effect of adding drilling Brpaydary tunnel Fitr 6 Faryab mine FLAC two-dimensional software is used. Geo mechanical parameters of the rock mass deformation of uniaxial load test point and test, software testing and Brazilians Rock lab, was conducted on 15 samples in the laboratory of rock mechanics. The results show that although in both cases the tunnel is unstable and need maintenance, but the maintenance is much heavier in excess drilling.
Keywords : over break software flac 2d stability analysis critical strain the critical shear strain