Quantitative assessment of the risk of unexpected natural disasters (flood, earthquakes, etc.) in the route of gas pipeline of district 9 of gas transmission operation using PHAST software

Quantitative assessment of the risk of unexpected natural disasters (flood, earthquakes, etc.) in the route of gas pipeline of district 9 of gas transmission operation using PHAST software

arash lazar farokhi1

1) industrial b.a

IOI Code : XYAH-ZDZKH
Publication : 3rd international conference of Science and Engineering(3icesconf.com)
Abstract :
    In this study, the quantitative assessment of the risk of unexpected natural disasters (foods, earthquakes, etc.), which may occur in the route of gas pipeline of gas transmission operation of district 9 and leads to irreparable human and financial losses has been investigated. This assessment is modeled by PHAST software based on collected information, such as (the pressure of the material in the process, the temperature of the material in the process, the phase of the material in the process, the composition of the material in the process, the volume of the evacuated gas, weather conditions, prevailing wind direction, the kind of scenario, the location of scenario, layout, population distribution and etc.). In this article, by modeling of the two kinds of flash fire and fire ball and drawing its related diagrams, it has been tried to determine the effect range of these events and also to obtain the counter diagram of the individual risk and loss probability in a range of different models as well as the F – N diagram of collective risk by entering the related data of determining risk such as population distribution, location of spark, the probability of spark occurrence, incident repeatability and etc. By having the F – N diagram of collective risk related to the examined sites, it can be compared with the standards of other countries and the degree of system s risk-taking and also the suitable approaches to control and reduce these accidents and its consequences can be determined.

Keywords : risk assessment fireball individual risk group risk