Optimization,gas lift and well complete one of the fields in southwestern Iran

Optimization,gas lift and well complete one of the fields in southwestern Iran

aria bali1

1) Iran University of Science and Technology Email :

IOI Code : XYBB-ZHDED
Publication : 3rd International Conference On Research Science And Technology(3rstconf.com)
Abstract :
    Vertical depends on primary hydrocarbon right about 2438 meters.The productive capacity of the reservoir was determined in 1316 drill a test well No. 3 producer of oil at a flow rate of 26,000 barrels per day and has about 32 bottom-1034-1001 API have been produced.As already producing fields in the South West of the country based on previous studies and initial conditions is done reservoirs.According to changes in the reservoir produced by a considerable part of primary storage OIP And changes in production methods and the need for enhanced oil recovery techniques, production methods need to be revised.In this study suggests that using computer modeling software using PIPESIM And gathering data, we can be a faster way to optimize production from an oil field in southwestern found.

Keywords : vertical depends enhance oil recovery computer modeling optimize production