Evaluation of Projects Performance by using Value Engineering and Theory of Constraints
Evaluation of Projects Performance by using Value Engineering and Theory of Constraints
Safoura Mousavi1
1) Master of Industrial enginnering
IOI Code
:
XYBB-ZHECB
Publication :
3rd International Conference On Research Science And Technology(3rstconf.com)
Abstract :
Today one of the main needs of organizations to improve project performance is considered in the context of project management, is reduce costs and time associated with an increase in quality. In organizations that are responsible for operational and unstructured, managers faces serious challenges to reduce costs, especially in companies operating as Iranian Gas Transmission Company, which provide services is accompanied with sensitivity and diversity.“Value engineering is a scientifically proven method for reducing costs in operations and maintenance processes can be used. This method with team approaches and analytical Limited of the study function, follow logical and useful solutions to increase their value. But experience has shown operational proposals with high performance, to implement in practice are faced with serious obstacles that Partly is concerned to the lack of entry to the upper layers of value engineering and management decision-making; In the present studying order to identify and removing the constraints that exist in the organization s overall policies and procedures, is used the tools of thought processes that the Theory of Constraints raised. In this study, methods of Value Engineering or theory of Constraints in one of the areas of maintenance of gas transmission lines is executed. After determining the first level functions using Theory of Constraints function mechanical repair a pipeline as one of the main bottlenecks to reduce costs in maintenance and repair of pipelines located detailed review and at that offered suggestions to reduce costs. Finally the four scenarios suggested that s because weight is not constant so decision criteria determined by the members of the group, using the AHP group decision model, choose one of the four scenarios described manner. One of the scenarios that brings further cost reduction, about 57% of the costs to reduce the payback period of 4 years.
Keywords : cost constraints function value value index