Time Series Projection in Groundwater s Electrical Conductivity Used By ARMA Models

Time Series Projection in Groundwater s Electrical Conductivity Used By ARMA Models

Ardalan Askari Fard1 Ebrahim Amiri2 Seyyed Ahmad Lashteh Neshaei3

1) M.s.c. Student, Department of Water Engineering, Lahijan, Iran
2) Associate Professor, Department of Water Engineering, Lahijan, Iran
3) Associate Professor, Coastal Engineering, University of Gilan

IOI Code : XYBB-ZHFFH
Publication : 3rd International Conference On Research Science And Technology(3rstconf.com)
Abstract :
    Limited qualified water resources requires the prevention of pollution of water resources. On the other hand, low quality of underground water resources and salinization of all water resources are considered complex obstacles in agricultural development of the whole country, especially the dry regions. There are several models for anticipating the qualitative and quantitative parameters of underground waters. Among those many models, time series model, which is frequently used in hydrology, is eminent. In this study, time series model was used to anticipate the electrical conductivity of two wells in east region of Guilan province, as a key factor in water quality. After normalizing the data by Johnson s model and identifying them by Mann-Kendall trend test, the study stepped into ARMA model. Then, by using Akaike and SBC, the most probable data was chosen and assessed. The study revealed that ARMA (3, 2) model with SBC=-16.14, AIC=-22.03, AIC=-22.03, RMSE=0.609, NMSE=0.303, CC=0.864, and CC=0.788 for Sheykhanbar well in Lahijan and ARMA (1, 1) model with SBC=-3.02, AIC=-5.38, RMSE=0.881, NMSE=0.24, and CC=0.788 for Ghazi-Mahale well in Langeroud had the most electrical conductivity.

Keywords : groundwater electrical conductivity time series projection arma