Analyze the effect of time delays in the process of development and construction projects do using fuzzy networks(study in the research is on the intersection of non -level of Dezful devotee)

Analyze the effect of time delays in the process of development and construction projects do using fuzzy networks(study in the research is on the intersection of non -level of Dezful devotee)

Mohammad Asti1 Jamshid Salahshour2

1) Graduate student, Department of Civil Engineering, Islamic Azad University, Shushtar, Iran
2) Assistant Professor, Department of Civil Engineering, faculty member, Shushtar, Iran

IOI Code : XYBD-ZKEKG
Publication : 4th International Conference On Research Science And Technology(4rstconf.com)
Abstract :
    Delay is the failure in completing an activity during the scheduled plan for it. Different factors cause to a delay in a project. Due to the fact that the delay cause an increase in the time of the project execution. Of course, it plays an important role in the increase in the projects current expenses, the lost chance expenses, decreasing the credit of the contractor’s project and delay in the return of the capital. Delay in the construction projects is undeniable due to their special complexities. The research shows that most of the world’s huge construction projects face more than 50 % increase of approximately. Also, due to a direct relationship between the time and project execution expenses, the increase in the execution time, it often causes an increase in the expenses. A review on the delay reason in the construction projects is a solution in decreasing them and it is a serious case that the whole world is paying attention to it. In various countries, it depends on the social, cultural, political, manage mental issues and so on, the delay reasons are various and different. After recognizing the delays, applying a proper approach in order to analyses the delay is important. This thesis analyses the influence of time delays in the construction development through using fuzzy networks and a case study on Dezful’s Janbaz non-surface instruction. And the existing results show that the time delays in the construction projects can be decrease through fuzzy networks.

Keywords : time delay fuzzy networks construction projects non surface intersection