Conceptual model design for cost estimation and risk assessment of project with work breakdown structure and responsibility assignment matrix
Conceptual model design for cost estimation and risk assessment of project with work breakdown structure and responsibility assignment matrix
hooman Mazaheripour1 Davoud Sedighizadeh2
1) Department of Industrial Engineering, Saveh Branch, Islamic Azad University(IAU), Saveh, Iran
2) Department of Industrial Engineering, Saveh Branch, Islamic Azad University(IAU), Saveh, Iran
IOI Code
:
XYBD-ZKFBE
Publication :
4th International Conference On Research Science And Technology(4rstconf.com)
Abstract :
Designing a conceptual model for estimating costs, risk assessment of projects, explain responsibility and activity prioritize is useful for industrial managers. in this article We propose a method for assessing risk of activities according to work breakdown structure and responsibility assignment matrix. This paper introduces stream lining procedures from project work breakdown structure (WBS) evaluating the duration processes and either the input cost hour or the fixed costs. activities priories After estimating cost and risk, With responsibility and work duration and Improved responsibility assignment matrix is specified. This model is implemented in the Petrochemical industry and analysis the result of the project and propose Improved responsibility assignment matrix
Keywords : risk responsibility assignment matrix work breakdown structure improved responsibility matrix